The I.FAST on Injectors for Storage Ring Based Light Sources workshop followed on March 07-08, 2024 at IBPT.
The workshop aimed to provide an opportunity to exchange information and knowledge on injectors in the context of realizing ultra-low emittance rings with sufficient beam quality and stability.
The I.FAST Bunch-by-Bunch Feedback Systems and Related Beam Dynamics workshop took place on March 04-06, 2024 at KIT Campus North. The workshop aimed to discuss a wide range of topics related to bunch-by-bunch feedback systems including new ideas and technologies, with the emphasis on exchanging information and sharing knowledge to engage in global networking in this scientific field.
moreOur paper Bayesian optimization of the beam injection process into a storage ring by C. Xu et al. and AI4Accelerators team leader A. Santamaria is in the Top-10 of the most-downloaded Physical Review Accelerators and Beams papers in 2023.
moreBilfinger Noell GmbH (BNG) achieved a world record in the magnetic field of a superconducting undulator for Free Electron Lasers. BNG designed and built a test sample of a superconducting undulator afterburner prototype (S-PRESSO). The sample was tested by a collaboration between the customer EuXFEL and IBPT.The measurements resulted in a magnetic field strength never achieved before in such devices.
moreKIT IBPT's photovoltaics covers half of the Bldg. 348 roof at Campus North, the home of KARA, and produced 228,447 kWh. In 2024 the remaining roof half will be covered to further enhance green energy production for accelerator R&D operation.
moreDima El Khechen has been elected to the Management Board of the Young High Energy Physicists Association (yHEP). The yHEP coordinates young scientist’s interests in particle, astroparticle, hadron, nuclear and accelerator physics.
more