KIT - Karlsruhe Institute of Technology image/svg+xml
Institute for Beam Physics and Technology (IBPT)
  • skip navigation
  • Home
  • Legals
  • Privacy Policy
  • Sitemap
  • KIT
    search
    • IBPT in the Media
    • Awards
    • News
      • News
      News
      • News 2025
      • News 2024
      • News 2023
      • News 2022
      • News 2021
      • News 2020
      • News 2019
      • News 2018
      • News 2017
      • News 2016
    • For you
      • For you
      For you
      • Education
        • Education
        Education
        • Bachelor's & Master's theses
        • Dissertations
        • Digitale AG-Vorstellung
          • Digitale AG-Vorstellung
          Digitale AG-Vorstellung
          • Digitale AG-Vorstellung am IBPT
      • Students
        • Students
        Students
        • Studying & Teaching
      • User
        • User
        User
        • Downloads
          • Downloads
          Downloads
          • User
      • in Industry
      • IBPT employees
    • Discover
      • Discover
      Discover
      • KITTEN
      • Accelerator Technology Platform (ATP)
      • Test Facilities
        • Test Facilities
        Test Facilities
        • ALFA
        • KARA
          • KARA
          KARA
          • Electron Beam Status
          • Accelerator
          • Insertion Devices
          • IBPT Beamlines
            • IBPT Beamlines
            IBPT Beamlines
            • IR 1
            • IR 2
        • FLUTE
          • FLUTE
          FLUTE
          • Layout
          • Goals
          • Publications
        • MCF
          • MCF
          MCF
          • CASPER I
          • CASPER II
          • LASMagLab
          • COLDDIAG
          • Materials
        • cSTART
          • cSTART
          cSTART
          • Publications
      • Industrial Activities
      • R&D
        • R&D
        R&D
        • MT-ARD
        • Projects
        • Compact Accelerators
        • AI4Accelerators
          • AI4Accelerators
          AI4Accelerators
          • Publications
          • Team AI
      • Publications & Presentations
        • Publications & Presentations
        Publications & Presentations
        • Publications
        • Presentations
        • Videos & Audio
        • Posters
      • KIT Light Source
        • KIT Light Source
        KIT Light Source
        • Publications
    • Events
      • Events
      Events
      • 2023 Tag der offenen Tür
        • 2023 Tag der offenen Tür
        2023 Tag der offenen Tür
        • Experimente & Besichtigungen
        • Führungen
        • Mitmachaktionen
        • Vorträge
      • Current Year
      • Weekly
      • Daily
      • Past
        • Past
        Past
        • Inauguration of FLUTE
    • Projects
    • About us
      • About us
      About us
      • The Institute
      • Organisation & People
        • Organisation & People
        Organisation & People
        • Director
        • Offices
        • Safety & SSB
        • Coordination & Projects
        • Departments
          • Departments
          Departments
          • Technology
          • ARD+O1
          • ARD+O2
            • ARD+O2
            ARD+O2
            • IT
            • AAC
            • ID
            • DRD
        • Research Groups
          • Research Groups
          Research Groups
          • Superconducting System Technology
        • IBPT members & LAS associates
        • Alumni
      • How to find us
        • How to find us
        How to find us
        • Postal address
    • Jobs
      • Jobs
      Jobs
      • Fields & Positions
      • General Information
    • Login
    • Startpage
    • Home
    • Legals
    • Privacy Policy
    • Sitemap
    • search
    • Campusplan Campus Map
    Institute for Beam Physics and Technology (IBPT)

     

    • Startpage
    • Discover
    • Test Facilities
    • KARA
    • Insertion Devices

     

    • Startseite
      • IBPT in the Media
      • Awards
      • News
      • For you
      • Discover
      • Events
      • Projects
      • About us
      • Jobs
      • Login
    • Discover
      • KITTEN
      • Accelerator Technology Platform (ATP)
      • Test Facilities
      • Industrial Activities
      • R&D
      • Publications & Presentations
      • KIT Light Source
    • Test Facilities
      • ALFA
      • KARA
      • FLUTE
      • MCF
      • cSTART
    • KARA
      • Electron Beam Status
      • Accelerator
      • Insertion Devices
      • IBPT Beamlines
    • Insertion Devices
    • Insertion Devices
    • Undulators

    Insertion Devices

    R&D of superconducting insertion devices

    Insertion device undulator SCU20 in KARA

    Insertion Devices

    The Insertion Devices (ID) group develops insertion devices for accelerator and synchrotron facilities. The group pioneered the development of superconductive undulators and was the first worldwide to test them with beam. In 2018,  the group installed the first commercially available superconducting undulator SCU20 in the storage ring KARA at KIT. SCU20 produces brilliant X-ray light without failure since its installation. For details see KIT press release.

    The activities include development of superconducting planar IDs, instruments and tools for quality assessment of the magnetic field of superconducting undulators, and integration of new superconducting IDs in the storage ring KARA and KIT synchrotron. For understanding the beam heat load mechanisms in a cold bore, the group led a large collaboration and developed COLDDIAG, a cold vacuum chamber for diagnostics.

    Within KIT collaborations applications of new superconducting materials to insertion devices are investigated. In addition, projects such as COLDIDAG are performed in collaboration with European partners (CERN, Diamond Light Source, Frascati National Laboratory, Rome University “La Sapienza,” STFC Daresbury Laboratory, STFC Rutherford Appleton Laboratory, University of Manchester, Cockcroft Institute of Science and Technology, and Lund University MAX-Lab) and industrial partners such as Bilfinger Noell GmbH.

    Insertion Devices
     
    Light sources make use of insertion devices (ID) to produce synchrotron radiation of highest brilliance. In 2004, Hara et al. described the concept of cryogenic permanent magnet undulators (CPMU) as an evolution of in-vacuum undulators (IVU).
    Superconducting undulators (SCU) can reach, however, for the same gap and period length, higher fields even with respect to CPMU devices, allowing to increase spectral range and brilliance.
    Insertion Devices Performance comparison of a SCU, a CPMU and an IVU considering the same magnetic length and the same vacuum gap. A given photon energy is reached by a SCU at a lower order harmonic: 20 keV can be reached with a SCU at the 5th harmonic, CPMU at the 7th harmonic, and IVU at the 9th harmonic. With a SCU it is possible to relax the beam properties and/or the magnetic field quality.

    Undulators and test stands

    SCU15 - SCUW - CASPER I - CASPER II - COLDDIAG - New Materials

    SCU15
    A 1.5 m long superconducting undulator  with a period length of 15 mm has been successfully developed, installed, and tested in collaboration with the company Bilfinger Noell GmbH

    Thanks to high-precision components, SCU15 fulfills stringent demands on the accuracy of the magnetic field. This makes SCU15 the first full-length superconducting device to reach higher peak magnetic fields than comparable cryogenic permanent magnet undulators.
    SCU15 at KIT
    SCUW

    Aim of the collaboration with the company Bilfinger Noell GmbH is also to develop superconducting undulators with switchable period length.

    The tunability of an insertion device can be increased by period length switching, which in superconducting IDs can be achieved by reversing the current in a separately powered subset of the superconducting windings.


    A superconducting undulator-wiggler, which allows to switch between undulator and wiggler mode, will be built to be tested at the IMAGE beamline.

    SCUW
    We have demonstrated the feasibility of period length switching using a 9 pole mock-up designed and manufactured by Bilfinger Noell GmbH and showed that there is no need to retrain the magnet after each switch.

    Credits cover image: KIT IBPT last change: 2020-08-02
    KIT – The Research University in the Helmholtz Association
    • Home
    • Legals
    • Privacy Policy
    • Sitemap
    • KIT